Search
design / fabrication / installation
Careers
Origin Taloona TEG package
Origin Taloona TEG package
More Coal Seam Gas (CSG) Glycol Dehydration Packages

Process Group delivered another set of Glycol (TEG) Dehydration & Regeneration packages for Origin Energy’s Spring Gully - Taloona facility, located south west of Chinchilla, in Queensland, Australia.

These packages are designed for the Filtration & dehydration of Coal Seam Gas (CSG) and have a capacity of 50 mmscfd of gas at the design operating pressure of 13,500 kPag. The packages are required to reduce the moisture level of the gas to meet pipeline specifications.


These packages were designed and built at Process Group’s head office facility in Melbourne, and were specifically designed to be trucked to site and installed with minimal on-site construction and hook up.
These packages represent the 10th set of gas dehydration packages that Process Group has designed and built for Origin Energy’s CSG facilities in Australia in the past 6 years.



TEG Gas dehydration & Filtration packages being prepared for shipment from Process Group’s Melbourne facility.

Posted on Saturday, November 21, 2009 (Archive on Monday, December 21, 2009)
Posted by pgwebadmin  Contributed by
Return    

Copyright Process Group Pty Ltd | Login